Core plugging could be a very important tools to delivering specific data requirements for reservoir. It is important to take plug samples within the first 24 hours after the core has arrived on surface in order to isolate the center section of core for accurate invasion analysis data. Under supervision of reservoir engineers and geologists, core samples taken from the reservoir are evaluated. Suitable locations for plugging is determined. Core plug with proper diameter is drilled using a diamond drill bit in order to proceed to the desired experiments.

امکان ارسال دیدگاه وجود ندارد.